Home > SET-UP EQUIPMENT > SET-UP TOOLS & TRANSPORTATION > MH Braced Support Pier
MH Braced Support Piers
bracedpier
bracedpier - MH Braced Support Pier :


TIE DOWN ENGINEERING
The leader in Manufactured Housing
Anchoring and Foundation Systems


Please refer to the instructions provided by the manufacturer, and/or the State and local regulations as to the pier placement and I-Beam spacing. Check specific load requirements for footings and pier pads along with Wind Zone requirements for new or used manufactured units. Steel Support Piers are designed for use as a replacement for dry stacked blocks, piers available up to a maximum of 30 inches.

1. After the unit has been put in place and leveled with the appropriate safety equipment, begin placing the piers under the main beams at manufacturers specified distance.

2. Center the Pier on the footing or pad using fasteners (4 #14 x 2” screws if required). Tighten pier head with one 3/4” nut above the one below pier top so the head cannot slide out of the pier. Part 3285.304 of the new HUD installation rule specifies that “Manufactured Pier heights must be selected so that adjustable risers do not extend more than 2” when finally positioned. 